Neptune System Replacing DoS Pump Head
Neptune Systems
$89.00
Direct OE replacement fluid metering head assembly for the Neptune DOS Fluid Metering System. The easy to install head replaces the tubing, roller, and plastic housing head cap.
How to Replace
Step 1: Hold down the sides of the Dos Head and the clips will release. Remove the pump head and set it aside.
Step 2: Pick up your new pump head and slip it right down into the old heads position and the clips should click into place. Test the Pumps rotation with the manual priming buttons.
How to Replace
Step 1: Hold down the sides of the Dos Head and the clips will release. Remove the pump head and set it aside.
Step 2: Pick up your new pump head and slip it right down into the old heads position and the clips should click into place. Test the Pumps rotation with the manual priming buttons.